Skip to product information
1 of 3

bhp.bighairyprofiles

BHG LA SESSION 112 (EVM-12L Cabinet IR)

BHG LA SESSION 112 (EVM-12L Cabinet IR)

Regular price $29.99 USD
Regular price Sale price $29.99 USD
Sale Sold out

 

BHG – LA SESSION 112 Cab Impulse Response Pack

The Sound of the LA Studios — Captured.

DEMO: https://youtu.be/aMNsy2IlOf0

EVERYTHING YOU NEED TO KNOW ABOUT IMPULSE RESPONSES

The LA SESSION 112 pack delivers the unmistakable clarity, punch, and dimension of the classic Pacific Woodworks 1×12 cabinet loaded with the legendary 12-inch speaker that defined countless 1980s session tones. From clean studio sparkle to high-gain wall-of-sound rhythm work, this pack captures the cab heard on countless records from players like Michael Landau, Dann Huff, and Steve Lukather. These speaker cabinets belong to current L.A. studio session ace Andrew Synowiec, and have been used on countless sessions. 

  • 14 IRs – Cab 1 (Pacific Woodworks 1×12)

    Captured with Shure SM57 + Royer R-121 for the classic balanced mic blend — articulate mids, full low end, and smooth top.

  • 14 IRs – Cab 2 (Matching 1×12)

    A complementary stereo pair, captured for seamless left/right placement or tonal variety

  • 3 Bonus Captures – 57 + Soyuz 1973

    Adds a modern LDC mic flavor with detailed mids and open high-end

  • 2 OS212 Captures - 1 Vintage, 1 New Black Label
  • 4 Alternate Versions

    Including one IR of the EVM-12L in a 4×12 configuration, plus extra mic positions and tonal variations for mix flexibility.

Format

  • 35 Total IR Files

  • 24-bit / 48 kHz WAV format (compatible with all major IR loaders and modelers).

The Tone

Legendary studio tone — powerful, and mix-ready — the LA SESSION 112 captures the polished, hi-fi sound of the golden-era LA session scene. Whether you’re chasing that Landau clean, Huff crunch, or Lukather sustain, or Zakk's authority, this pack delivers the sonic DNA of the 80s studio world.


Delivery

Your digital download will be prepared and ready moments after your purchase.

Care Instructions

These profiles should install without any issues, but if you run into any poblems, please try updating to the latest Kemper OS. That seems to fix most problems that arise. Enjoy!

View full details